Construction Photos
Quimper site status 09_2011-05

Recycling the existing house

Quimper site status 09_2011-16

The site cleared

Quimper House - Construction 0004

Prepping the site for the foundation

Quimper House - Construction 0014

Foundation formwork

Quimper House - Construction 0454

Foundation insulation

Quimper House - Construction 0472

Radiant floor tubing getting installed

Quimper House - Construction 0024

Inner workings of the footings and slab

Quimper House - Construction 0040

The family looks on during the concrete pour

Quimper House - Construction 0056

The concrete pour

Quimper House - Construction 0063

The concrete pour complete

Quimper House - Construction 0072

Formwork off and preparations to frame the walls

Quimper House - Construction 0094

Framing the walls

Quimper House - Construction 0097

Framing the walls

Quimper House - Construction 0103

The first walls goes up

Quimper House - Construction 0119

More walls added

Quimper House - Construction 0130

Most of the main floor walls framed and up

Quimper House - Construction 0145

Stair framing goes in

Quimper House - Construction 0158

Second floor joists going in

Quimper House - Construction 0162

First wall of the second floor up in place

Quimper House - Construction 0519

A small taste of Winter doesn't stop work

Quimper House - Construction 0169

Colder temps and more Winter pauses work

Quimper House - Construction 0170

Snow in the house doesn't happen that often

Quimper House - Construction 0182

Living Room space

Quimper House - Construction 0185

Stairwell view from the entry

Quimper House - Construction 0187

Kitchen area taking shape

Quimper House - Construction 0186

More walls of the second floor go in

Quimper House - Construction 0195

Roof framing begins

Quimper House - Construction 0215

Roof framing begins

Quimper House - Construction 0240

Upper flat roof taking shape

Quimper House - Construction 0644

Kitchen flat roof going on

Quimper House - Construction 0247

The upper, sloped roof being built

Quimper House - Construction 0650

The upper roof nearing completion

Quimper House - Construction 0253

Upper roof built

Quimper House - Construction 0672

Stairwell and upper circulation area

Quimper House - Construction 0690

Kitchen area with exposed beam

Quimper House - Construction 0268

Admiring the garden view

Quimper House - Construction 0338

Playing with daylight in the upstairs bathroom

Quimper House - Construction 0693

Preparing for the roofing

Quimper House - Construction 0322

Roofing nearing completion

Quimper House - Construction 0781

The massing of the building revealed

Quimper House - Construction 0789

Blueskin installation begins

Quimper House - Construction 0356

Blueskin wrapping around the house

Quimper House - Construction 0348

Blueskin around the kitchen

Quimper House - Construction 0410

The view from King George lookout above

Quimper House - Construction 0797

Most Blueskin complete

Quimper House - Construction 0378

Blueskin complete around the kitchen wing

Quimper House - Construction 0403

Window installation

Quimper House - Construction 0405

Most of the windows installed

Quimper House - Construction 0882

Our site signs up

Quimper House - Construction 0968

Installation of 4 inches of rigid insulation begins

Quimper House - Construction 0892

The kids don't at all mind the distance to the playground

Quimper House - Construction 0915

Intricate insulation work around the square porthole windows

Quimper House - Construction 1070

Clean & simple installation of the insulation layer

Quimper House - Construction 1094

Many layers of the building envelope in view

Quimper House - Construction 1005

Strip footings for the porch

Quimper House - Construction 1068

Reclaimed wood getting prepared for the porch structure

Quimper House - Construction 1100

Reclaimed lumber becoming structure for the porch

Quimper House - Construction 1109

The porch roof roof going on

Quimper House - Construction 1116

The porch takes shape

Quimper House - Construction 1120

Building envelope inspection by our Green Rater

Quimper House - Construction 1125

Our builder describes some of the finer points of the envelope

Quimper House - Construction 1168-1

The house in its environment

Quimper House - Construction 1168-2 (1646)

The building ready for the exterior siding

Quimper House - Construction 1269

The blower door test to assess air leakage

Quimper House - Construction 1293

The exterior siding making its way around the building

Quimper House - Construction 1329

Preparing to install the drywall

Quimper House - Construction 1507-1 (1708)

Drywall transforming the space inside

Quimper House - Construction 1507-2

Drywall nearly complete

Quimper House - Construction 1544

Exterior side wraps more of the house

Quimper House - Construction 1599-2 (1725)

Exterior siding nearly complete

Quimper House - Construction 1599-1

Looking towards the entry, the painting begins

Quimper House - Construction 1599-3 (1748)

A base layer of paint in the kitchen

More images coming..

...